Posts Tagged :

commercial kitchen extraction system

New Extract System Installation

150 150 Northern Fan Services

Our team recently completed the installation of a new extract system in Pickering, North Yorkshire.

Our client got in touch as he had purchased the extraction system but his previous install team had let him down. We attended site to complete a survey of the kitchen and the system before attending the following week to install.

We manufacture and install all of our systems but, in situations where a client has already committed to the purchase of a canopy/system elsewhere, we would be happy to quote for install only.

Need a quote for either the supply and install or install only of an extraction system? Visit our contact page HERE to get in touch with our sales team via phone, email or Watsapp.

Have a look at other recently completed projects, or send us a non-urgent, out of hours message via our Facebook Page.

Every new extract system installed by us comes with 1 years labour guarantee on all works and any equipment we supply comes with a years manufacturers warranty.

We repair and install all commercial extraction systems in a wide range of businesses. From restaurants, takeaways and cafes to hotels, schools, colleges, care homes and factories. We cover Hull, Beverley, Goole, Doncaster, Leeds, York, Sheffield, Bradford, Manchester, Liverpool and most towns and villages in the North of England.

Kitchen canopy and wall cladding manufactured in DP1 fine grain stainless steel.

New Extraction System Install, North Yorkshire

1024 768 Northern Fan Services

Extraction system install recently completed. Due to a kitchen upgrade/renovation at Brickfields Farm, North Yorkshire, a new extraction system installation was necessary. Our engineers attended site to complete a site survey to determine canopy size, fan type, extract route etc. All our commercial canopies are bespoke made in high quality stainless steel complete with filter bank and grease filters.

A 2850mm wide stainless steel canopy was manufactured and fitted with wall cladding in DP1 fine grain stainless steel. The rest of the system comprised of 500mm wide stainless ductwork, a 500mm diameter short cased axial fan and a high velocity cowl fitted above roof level.

Installation of this commercial extraction system was completed within 2 days and all items are made and installed to DW172 standards.

Need a new commercial extraction system for your kitchen?

Your commercial kitchen can benefit from the heavy duty construction and easy clean design of our canopies. See details of our tailor made canopies here.

Need a new extraction system install? Contact our Sales Team via the following:

Call – 01482 650100

Watsapp – 07927743336

Email – sales@northernfanservices.co.uk

Our prices are competitive and turn around time from acceptance of quote is around 10-14 days.

See our Facebook page for other recently completed jobs – HERE