Posts Tagged :

york city centre restaurant fan

Next Day Emergency Fan Replacement

150 150 Northern Fan Services

Our team recently carried out this next day emergency fan replacement. This 560mm diameter Flakt Woods extractor fan was installed within a day of the initial breakdown at Double Tree Hilton, York. The original fan had gone down and it was determined that a replacement was necessary. Our team got the call late afternoon and engineers were on site to install the following morning.

We carry most brands, models and sizes of fans in stock. The quickest way to get a quote for replacement from us is to send us all the details from the manufacturers label on the fan when possible. This ensures our engineers come out with the correct replacement and that it is compatible with your system.

A fan breakdown is one of the most frustrating situations in a busy commercial kitchen. Don’t hesitate to give us a call and we can attend quickly and install either a same day or next day emergency fan replacement.

Check out our Facebook page here to see other recent installs.

Send us an email enquiry here to get in touch with our friendly sales team.

How to avoid a breakdown in the future?

  • Have your fan serviced regularly.
  • Have your fan cleaned every 6-12 months.
  • Report any issues, noises and reduced power immediately.

The extractor fan is the key component in any commercial ventilation system so it’s important that it’s carefully chosen and regularly serviced to ensure your business isn’t compromised by poor performance or interrupted by avoidable breakdowns.

We also clean and service fans and can offer a regular service contract should you require. Give our team a call to enquire – 01482 650100

New Full Extraction System in York Restaurant

150 150 Northern Fan Services
New extraction system install in York city centre. Bespoke made commercial stainless steel canopy. Kitchen extraction system fitted.
1.5metre bespoke made stainless steel canopy in DP1 fine grain stainless steel

This busy restaurant and grill house in York city centre called us as they needed a new full extraction system installing. The existing system was no longer sufficient for what they needed. An engineer attended site to complete a site survey to determine what system would be best for this location.

Once the client was happy we got the items in to production. As all of our systems are bespoke made, installation will go ahead roughly a week after a deposit is taken. The canopy was made to measure and included a filter bank and 2 x bafel filters (pictured above). Check out our canopies page at https://northernfanservices.co.uk/tailor-made-canopies/ to see how we could help your business with a new system.

The Corner Grill House, York.

The new full extraction system included canopy, filters, ductwork, extractor fan, speed control and all weather louvre. Installation took a day to complete.

Clients often contact us when their current system is no longer performing as it should. This is usually because the kitchen has grown and new equipment has been added, but the extraction system has not been extended to accommodate this. Have a look at this link from HSE detailing the guidelines for ventilation and extraction in catering kitchens https://www.hse.gov.uk/pubns/cais10.pdf.

Have a look at our facebook page for pics of recent work https://www.facebook.com/northernfanservices

The Corner Grill House, York